Blog

Bassano Wastewater Treatment Upgrades Project

Bassano Wastewater Project

This project included upgrades to an existing lagoon, its anaerobic and facultative cells, the construction of a new storage cell, the installation of a treated wastewater irrigation system, a sanitary trunk main replacement with one … Read more

Highway 515 Project

Heavy Equipment operating at Highway 515 project in southern Alberta

This project included the 14.5 kilometers of road construction. With topsoil stripping and common excavation, disposal of waste material, several culvert installations, granular fill, stabilization geotextiles, erosion control, and more. The project consisted of 14.5 … Read more

Newell Regional Landfill Project

Newell Landfill Project

This was a multi-phase project that included the construction of a municipal solid waste cell with a 1.2-meter clay liner and berm excavation alongside the installation of a leachate collection system made up of geotextile … Read more